A construction worker offered a rare look inside the alleged near-collapse of 235 East 42nd Street and compared the issue to conditions he’d noticed when the twin towers collapsed on Sept. 11, 2001.
The structural emergency at the Gensler Building involved two load-bearing steel columns on the skyscraper’s 21st floor that allegedly buckled.
“We do all the power generation,” Steamfitters Local 638 business agent Cliff Johnsen told The Epoch Times’ sister media NTD. “We do all the water waste treatment. We do all the infrastructure in New York. I’ve never seen steel columns bend. The only time I saw that was on 9/11 and that’s scary to me.”…